Licenses required for comprehensive renovation

Content

Licenses required for comprehensive renovation

The licenses required for comprehensive renovations depend on the actual scope of the work (finishes vs. structure/use/common elements) and the procedure accepted by your local council (license, responsible declaration, or prior notification). To make the right decision, compare what you are going to do (structure, facade, common elements, change of use, extension) with the required documentation (report/project, plans, waste, fees) and apply before you start to avoid delays and penalties.

What licenses or permits may be required for a comprehensive renovation?

To understand which licenses are required for a comprehensive renovation, it is important to differentiate between:

  • Minor works permit

  • Major construction permit

  • Affidavit / prior notification

Minor works permit

This applies to minor interventions that do not alter the structure of the building or affect common elements or the façade. For example: replacement of tiles, floors, windows, minor redistributions without load-bearing walls.
The procedure is simpler: in many cases, an application or a responsible declaration is sufficient.

Hands of workers reviewing and pointing at a document next to a safety helmet

Major construction permit

This applies to renovations involving structural changes, comprehensive refurbishment, modification of the volume or use of the property, or work on common elements of a building.
In these cases, it is mandatory to submit a technical project prepared by an architect or technical architect, and the process is more demanding.

Affidavit / prior notification

Some local councils allow for minor renovations to be carried out on the basis of a sworn statement or prior notification from the interested party, rather than a formal license, assuming that the work complies with regulations.

This mechanism reduces deadlines provided that the project does not have structural or complex effects.

Are you planning a complete renovation and don't know where to start?

Our team of architects can help you manage the project, technical documentation, and licenses required for your renovation.

How to know which license you need depending on the work

The choice between minor works, major works, or a declaration of responsibility depends on the technical scope of the project. Guiding criteria:

Criteria/type of workMinor license?Major license or technical project?
Changes in finishes, paint, flooringYesNo
Tiling, windows, interior doorsYes, if it does not affect the structure.If it touches load-bearing walls, no.
Tear down or build structural wallsNoYes
Expand built areaNoYes
Change of use of the property (commercial space → residential, etc.)NoYes
Intervention in common elements of the buildingNoYes
Facade, roofs, recessesIt depends on the municipality.In many cases, yes.

Rule of thumb: if the work affects the structure, volume, facade, common elements, or use, it tends to be classified as major work (requiring a project). If it is a finish/light redistribution without affecting the structure, it usually falls under minor work or a responsible declaration, if the municipality accepts it.

Standard documentation for processing the necessary licenses for comprehensive renovation

Although it may vary depending on the local council, these are the most common documents:

  • Official application form (urban planning).

  • Technical or descriptive report detailing the actions taken.

  • Plans (current state and renovated state; layout, facilities; structure if applicable).

  • Detailed budget (ideally with clear items).

  • Approved technical project (when required, usually for major construction work).

  • Previous certificates or licenses if installations (electricity, gas, water) are affected.

  • Waste management report (when required).

  • Proof of ownership or authorization from the owner.

  • Proof of payment of municipal taxes.

  • Occasionally, municipal bond to ensure proper execution/management.

Interior of a house undergoing renovation with exposed brick wall and finished room next door

Steps in the processing procedure

Typical flow of a building permit for comprehensive renovation:

  1. Prior consultation with the City Council to confirm the urban feasibility of the project.

  2. Preparation of technical project (if applicable) and other documentation.

  3. Submission of the file to the Municipal Registry / Urban Planning Department.

  4. Municipal technical review and, if applicable, corrections.

  5. Resolution (approval or denial).

  6. Payment of fees and security deposit (if applicable).

  7. Formal obtaining of the permit and file number.

  8. Commencement of work in accordance with approved conditions.

  9. Completion of work and presentation of final certificate (or installation certificate, if applicable).

  10. Municipal inspection if required by local regulations.

Regulations that usually come into play in a comprehensive renovation

When carrying out a comprehensive renovation, it is essential to comply with state, regional, and local regulations. In general, the following are usually taken into account:

  • Building Regulations Act (LOE): technical responsibilities, project planning, and execution of works.

  • Technical Building Code (CTE): safety, habitability, and energy efficiency requirements.

  • Land Law / Regional Urban Planning: parameters for land use and urban planning.

  • Low voltage electrical regulations (REBT) and installation regulations.

  • Local regulations (noise, heritage where applicable, ordinances, and planning).

Important: the exact classification (minor/major/declaration) and the specific requirements depend on the municipality and the type of intervention.

Risks of carrying out comprehensive renovations without permits

Undertaking a comprehensive renovation without the proper permits can result in:

  • Administrative fines or financial penalties.

  • Order to halt construction work.

  • Requirement to restore the property to its previous condition.

  • Problems legalizing the work in the future or transferring ownership.

  • Partial nullity of related urban planning acts.

Hands pointing at architectural plans on a table during a construction review

Additional factors to review before deciding on the licensing route

In addition to "what you are going to renovate," the following factors are often decisive:

  • Community building: if there is intervention in common elements, permits/conditions tend to become stricter.

  • Facade/roof: this is often a red line for demanding more comprehensive procedures.

  • Change of use: almost always involves greater documentary/technical requirements.

  • Installations (gas/electricity): may require specific certificates and additional checks.

  • Urban planning compatibility: if there are planning constraints, it is advisable to identify them before drafting everything.

Common mistakes that complicate execution

  • Starting the work "from the inside" thinking that no paperwork is necessary, and then discovering that it affects the structure/common elements.

  • Submitting reports, plans, and budgets that do not describe exactly the same thing (corrections are omitted).

  • Do not request additional documentation (waste, facilities, authorizations) and delay the file.

  • Trusting that the affidavit serves "for everything" without verifying municipal limits.

  • Failure to follow up on the file and respond late to corrections.

Practical tips for architecture studios

  • Integrate license management as part of the service from the outset (not as a "final extra").

  • Work with clear classification criteria: structure/use/common elements/facade as the main variables.

  • Adjust the documentation package to the municipality to reduce corrections.

  • Keep the file monitored and prepare quick responses to requests.

  • Discuss deadlines and administrative risks in the briefing with the client (without promising speed).

Conclusion

In summary, the licenses required for comprehensive renovation will depend on the scope of the work: whether it is minor work, major work, or if a responsible declaration is permitted. In all cases, the key is to submit the required technical documentation, demonstrate compliance with regulations (CTE, LOE, and local urban planning), and follow the municipal process. Proper management avoids penalties, delays, and future legal problems.

At Estudio Cabana, we develop architectural and renovation projects with attention to every detail, from design to technical management.

Frequently Asked Questions

What permit is required for a complete renovation?

It depends on the scope of the work. If the renovation changes the layout or structural elements, it usually requires a major building permit. For simpler renovations, a minor building permit or a responsible declaration may suffice.

Normally, the architect or technician responsible for the project is in charge of preparing the documentation and processing the license with the corresponding city council.

The timeframes depend on the local council and the type of license. In many cases, the process can take from several weeks to a few months.

Yes, when the renovation affects the layout, structure, or facilities of the property, it is necessary to have a technical project drawn up by an architect.

Are you thinking about doing a complete renovation?

You may also be interested in...

B2C Form